Gold Member Since 2013
Audited Supplier
Rizhao Fast & Fasten Scaffold Co., Ltd.

Base Plate, Scaffolding Base Plate, Steel Base Plate manufacturer / supplier in China, offering Steel Construction Base Plate for Scaffolding, Ringlock Scaffolding Rosette Layher Parts (FF-004), High Quality Scaffolding Ringlock System Standards (FF-B003D) and so on.

(/ )

Supplier Homepage Product Jack Base Steel Construction Base Plate for Scaffolding

Steel Construction Base Plate for Scaffolding

Purchase Qty.:
(Pieces)
1,000-19,999 20,000+
FOB Unit Price: US $2.2 US $2
Purchase Qty. (Pieces) FOB Unit Price
1,000-19,999 US $2.2
20,000+ US $2
Get Latest Price
Port: Qingdao, China
Production Capacity: 20 Containers/Month
Payment Terms: L/C, T/T, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: FF-0014
  • Type: Fixed
  • Framework: Combined Scaffolding
  • Lapping Form: Full Scaffolding
  • Move Method: Attached Lifting Scaffolding
  • Construction Properties: Building Scaffold
  • Surface: HDG Eg Painted
  • Tube Size: 26mm/30mm/32mm/56mm
  • Trademark: FF
  • Specification: 125*125*5mm
  • HS Code: 7308400000
  • Material: Steel
  • Structural Style: Multi-Pole Scaffolding
  • Supporting Mode: Floor Type Scaffolding
  • Erection Position: External Scaffolding
  • Scaffolding Part Type: Base Plate
  • Size: 125*125*5mm
  • Thickness: 4mm/5mm/6mm/8mm/10mm
  • Package: Carton ,Pallet
  • Transport Package: Woven Bags with Pallets
  • Origin: Rizhao Shangdong
Product Description
EN74 Scaffolding Base Plate (125*125*5mm)

Scaffolding base plate used on prop or screw jack.

1. Size: 90mm/100mm/110mm/125/150mm/160mm/180mm
2. Thickness: 4mm/5mm/6mm/8mm/10mm
3. Tube size: 26mm/30mm/32mm/56mm
4. Finishing: Electro-plate, hot DIP galvanized, powder coated
Steel Construction Base Plate for Scaffolding
Steel Construction Base Plate for Scaffolding

Why you choose us?
1)Highest quality -never use any equipment that is damaged or deteriorated in any way
2)Safety -inspect all equipment before using
3)Competitive price - factory suppler direct
4)We have strong engineering team that can give best solution for your project
5)Cutting -Edge product development
Consult your scaffolding supplier when in doubt-scaffolding is his business. Never take chances
Our firm belief that our customer's success are the only guarantee of our success.
We are a professional manufacture of scaffodling, we can produce as per customer demands

Steel Construction Base Plate for Scaffolding

Production Equipment
We have full set of production equipment, including model machine, punching machine, rolling machine, sand blasting and etc. These production equipments will show how the products are produced and we also can produce as your requirements using these equipments.
Steel Construction Base Plate for Scaffolding


Quality Control
Recognizing that quality control is a key factor that determines success in overseas markets, our factory uses state-of-the-art facilities to ensure products meet the standards in the United States and European countries.


All products are manufactured under stringent in - house quality control plansAll products strict quality inspection, all the raw materials are inspected before use, the product must be tested before leaving the factory.


Packing
Woven bag and pallet, carton, plywood case, as your request.
Steel Construction Base Plate for Scaffolding


OEM severice available
1)our ability to customized production to meet customer's specifications and requirements
2)our focus on building deep long-lasting relationship with our customers
3)our commitment to meet customers needs
Quality comes first, customers are the highest, operate with honest
TypeScaffolding  Jack Base
MaterialQ235 Material is as per customer's demand with high tensile and yield stress
ColorSilver, as customer's requirement
Surface TreatmentElectro galvanized, Hot dip galvanized, Powder coated, Painted
AdvantagesTop quality, Competitive price, Timely delivery, Good Service, Standard package,
CertificationEN74
Minimum order1000 pieces
Supply ability20container/month
PortQingdao
CurrencyUSD
PaymentL/C, T/T, 30% in advance
PackageWoven bags with pallets or as your requirements
Deliverywithin 30 days after confirmation or as your requirements
 
Steel Construction Base Plate for Scaffolding
 
Send your message to this supplier
Avatar
Ms. Lily
Trading Manager
*From:
To: Ms. Lily
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now